Multi-EV Charging Setup in Los Altos
๐Ÿ“Los Altos, CA

Multi-EV Charging Setup in Los Altos

Multi-EV charging setup in Los Altos โ€” smart load sharing for 2+ EVs on one panel. DPM expertise means panel upgrades are rarely needed.

๐Ÿ“ž Call (650) 542-8877

Multi-EV Charging Setup in Los Altos: What You Need to Know

Electric Utility

PG&E

Permit Authority

City of Los Altos Building Division

Permit Timeline

5โ€“14 business days

Typical Cost

$800โ€“$1,500

Common Panels

100A, 200A

EV Adoption

high

Permits in Los Altos go through the City of Los Altos Building Division, which typically processes EV charger applications in 5โ€“14 business days. We submit the load calculation per NEC 220.87, panel schedule, and one-line diagram with every application โ€” getting most installs approved on the first review. We schedule the final inspection on your behalf and you don't need to be home for it.

Los Altos sits in one of the highest EV-adoption markets in the country, with high EV penetration and growing fast. Upscale Silicon Valley suburb. High homeownership, predominantly SFH. Many mid-century homes with 100A panels needing upgrade. Apple and Google employees. Very low crime, strong community ties. Los Altos Hills (adjacent unincorporated) has even larger lots. The local utility, PG&E, offers EV-specific time-of-use rates that cut overnight charging costs roughly in half โ€” most ChargeWizards customers in Los Altos pay about $0.30โ€“$0.40/kWh during off-peak hours, or roughly $1.20 per gallon-equivalent for an EV.

ChargeWizards has installed multi-ev charging setup in homes across Los Altos โ€” from single-family homes with 100A panels to newer construction with 200A service. Every install includes a free pre-quote panel assessment (so we never quote a panel upgrade you don't need), the city permit, dedicated 240V circuit, mounting, commissioning with the charger app, and final inspection coordination. Our owner is on every job โ€” no subcontractors, no rotating crews. CSLB C-10 #1134931, fully licensed and insured.

Available Rebates in Los Altos

SVCE EV Charger Rebate

Up to $500

Check with utility

Federal 30C Tax Credit

30% up to $1,000

US homeowners

PG&E EV Rate Plan

50% off overnight charging

Utility customers

About Multi-EV Charging Setup

Install charging for 2+ EVs in the same home or property. Includes load balancing and smart charging strategies to charge multiple vehicles without overloading the panel.

How It Works

01

Free Quote

Call (650) 542-8877 or request online. We assess your panel, garage layout, and charging needs. Firm price within 24 hours.

02

Permit Application

We pull the electrical permit from your local building department. Most straightforward installs qualify for expedited review.

03

Installation

Licensed electrician installs dedicated 240V circuit, mounts the EVSE, and connects everything per NEC code. Typically 3โ€“5 hours.

04

City Inspection

We schedule and manage the inspection with your building department. You don't need to be present.

Estimated Timeline

1โ€“3 weeks

Why Choose ChargeWizards in Los Altos?

โœ“

Locally based โ€” serving Los Altos and surrounding cities

โœ“

EV charging is our only service โ€” 100% of our work

โœ“

DPM specialists โ€” avoid unnecessary panel upgrades

โœ“

Permit experts โ€” we handle all paperwork with City of Los Altos Building Division

โœ“

SVCE EV Charger Rebate rebate expertise

โœ“

CSLB C-10 #1134931 โ€” licensed, bonded, insured

โœ“

Call (650) 542-8877 โ€” real people answer

EV Charger Installations in Los Altos

EV charger installed in home garage - Los Altos

Home Garage Install

Tesla Wall Connector outdoor installation - Los Altos

Tesla Wall Connector

Residential driveway EV charger - Los Altos

Residential Setup

EV Charger FAQs for Los Altos

Ready for fast, reliable home EV charging?

Chat with David for a free quote โ€” or call us directly. We typically respond within minutes.

๐Ÿ“ž (650) 542-8877

Licensed C-10 contractor ยท No obligation ยท Bay Area only