
EV Charging for New Construction in Palo Alto
New construction EV charging in Palo Alto โ CA Title 24 EV-ready rough-in for builders, ADUs, and major renovations. GC coordination included.
EV Charging for New Construction in Palo Alto: What You Need to Know
Electric Utility
Palo Alto Utilities (City-owned)
Permit Authority
City of Palo Alto Development Services
Permit Timeline
5โ14 business days
Typical Cost
Most standard installs $2,550 all-in; pre-wired from $850; final price depends on your setup
Common Panels
200A, 400A
EV Adoption
high
Palo Alto claims one of the highest EV adoption rates in the country, and it has a permit process to match. The City of Palo Alto Development Services department reviews every EV install against a full NEC 220.87 load calculation โ so every ChargeWizards quote includes a pre-built panel schedule and one-line diagram to avoid re-reviews. Most Palo Alto neighborhoods (Professorville, Crescent Park, Midtown, South Palo Alto) have 200-amp service, making the electrical work straightforward. The real differentiator here is the city-owned utility: City of Palo Alto Utilities (CPAU) serves Palo Alto instead of PG&E, so PG&E's charger rebate does not apply. Contact CPAU for its current programs; we provide the invoice, permit, and photos most programs ask for.
Permits in Palo Alto go through the City of Palo Alto Development Services, which typically processes EV charger applications in 5โ14 business days. We submit the load calculation per NEC 220.87, panel schedule, and one-line diagram with every application โ getting most installs approved on the first review. We schedule the final inspection on your behalf and you don't need to be home for it.
Palo Alto sits in one of the highest EV-adoption markets in the country, with high EV penetration and growing fast. Tech worker hub โ very high EV adoption (Tesla and Rivian everywhere). City-owned utility (CPAU), not PG&E; contact CPAU for current EV programs. Many 200A panels, newer homes often have 400A. Stanford proximity means rental properties too. Permit process known to be thorough. The local utility, Palo Alto Utilities, offers a general residential time-of-use rate (E-1-TOU) rather than an EV-specific plan; ask CPAU whether it fits your charging schedule.
ChargeWizards has installed ev charging for new construction in homes across Palo Alto โ from single-family homes and condos with 200A panels to newer construction with 200A service. Every install includes a free pre-quote panel assessment (so we never quote a panel upgrade you don't need), the city permit, dedicated 240V circuit, mounting, commissioning with the charger app, and final inspection coordination. Our owner is on every job โ no subcontractors, no rotating crews. CSLB C-10 #1134931, fully licensed and insured.
Rebates and Incentives in Palo Alto
City of Palo Alto Utilities EV programs
Contact CPAU for current programs and amounts
Palo Alto Utilities customers
Palo Alto Utilities E-1-TOU rate
General time-of-use rate, not EV-specific (a rate plan, not a rebate)
CPAU residential customers
The federal 30C EV charger tax credit for homes ended for chargers placed in service after June 30, 2026. What is still available
Rebate disclaimer: ChargeWizards can provide documentation such as your invoice, permit, and installation photos to help support a rebate application, but we do not guarantee any rebate, eligibility, or amount. Rebate programs and funding change often and can end without notice, so please confirm eligibility and apply directly with the program administrator. Program information last checked September 26, 2026.
About EV Charging for New Construction
EV charging rough-in and installation for new construction or major renovation. CA Title 24 requires EV-ready conduit in all new construction.
How It Works
01
Free Quote
Call (650) 542-8877 or request online. We assess your panel, garage layout, and charging needs. Firm price within 24 hours.
02
Permit Application
We pull the electrical permit from your local building department. Most straightforward installs qualify for expedited review.
03
Rough-In
We install conduit and capacity during framing so finish work can continue without disruption. Final circuit completed later per Title 24.
04
City Inspection
We schedule and manage the inspection with your building department. You don't need to be present.
Estimated Timeline
1โ3 weeks
Why Choose ChargeWizards in Palo Alto?
Palo Alto is served by City of Palo Alto Utilities, not PG&E. We point you to CPAU for current programs and provide the documentation they ask for
Development Services permit requirements handled expertly โ NEC 220.87 load calcs, panel schedules, one-line diagrams submitted complete at first review
From Professorville to Crescent Park to Midtown โ we've installed in every Palo Alto neighborhood and know the local inspection expectations
EV Charger Installations in Palo Alto

Home Garage Install

Tesla Wall Connector

Residential Setup
EV Charger FAQs for Palo Alto
Ready for fast, reliable home EV charging?
Chat with David for a free quote - or call us directly. We typically respond within minutes.
Licensed C-10 contractor ยท No obligation ยท Bay Area only
EV Charger Installation Guides
Not sure if your panel can handle an EV charger? See our guide on Tesla Power Management options โ
Tesla Power Management
Static, Dynamic & Group modes โ which one fits your panel?
Do I Need a Panel Upgrade?
Most Bay Area homes don't โ NEC 220.87 + DPM lets you skip the upgrade.
Complete Cost Guide
What does EV charger installation really cost?
Permit Guide
Permits, timelines, and what to expect in California.