Your Home is Pre-Wired. Let's Get You Charging.
New construction homes come EV-ready. We mount the charger, land the wires, commission to the app, and walk you through the first charge — typically in under 2 hours.
CSLB C-10 #1134931 · Tesla Certified · Bay Area
Is My Home Pre-Wired?
If any of the following are true, your install is a 2-hour job.
✓ 240V outlet in or near the garage
NEMA 14-50 (50A), 14-30 / 10-30 (dryer), 6-50 (welder), 6-20 — any of these usually qualify. Builders sometimes label them "EV."
✓ Junction box marked "EV-ready"
Title 24 has required EV-ready conduit and capacity in new California construction since 2017. The dead-end box on your garage wall is doing exactly what it was meant to.
✓ Sub-panel in the garage
Some custom homes were built with a dedicated EV sub-panel. We land the charger on the existing breaker and you're done.
✓ Recent panel work with a labeled spare
If your previous electrician already pulled a 60A or 50A circuit and labeled it for future EV, your install is a 2-hour job.
Why a Pre-Wired Install is So Fast
2-hour install
Mount the charger, land the wires, commission to the manufacturer's app, walk you through the first charge. Most pre-wired jobs are done in under 2 hours.
No permit delays
On a clean like-for-like connection to existing wiring, many Bay Area jurisdictions don't require a separate permit. We confirm with your AHJ before scheduling — never with a guess.
From $950
Charger + connection + commissioning + walkthrough — all in. No hourly games, no after-the-fact upcharges. If your home isn't truly pre-wired, we tell you upfront and quote the real number.
Full warranty
Tesla Universal Wall Connector commissioned by a Tesla Certified installer keeps the full manufacturer warranty intact. Same applies to ChargePoint, Emporia, and Grizzl-E units we install.
Title 24: Why Your New Home is Already EV-Ready
California's Title 24 building code has required new single-family homes to include EV-ready electrical infrastructure since 2017 — typically a dedicated 208/240V circuit and listed receptacle in the garage, or labeled conduit with panel capacity reserved.
Most builders go further and install a NEMA 14-50 outlet so the buyer can plug in a charger immediately. If your home was permitted in 2018 or later, you're very likely looking at a 2-hour install.
Pre-Wired EV Charger FAQs
Pre-wired? Let's get you charging tonight.
Send a photo of your panel and the existing outlet or junction box. Firm same-day quote in minutes.
Licensed C-10 contractor · No obligation · Bay Area only