EV Charger Installation in Campbell, CA

ChargeWizards is the licensed EV charger installation company serving Campbell, CA — CSLB C-10 #1134931, Tesla Certified. Campbell offers some of the most straightforward EV charger installs in the South Bay — 1960s–1980s suburban homes with 125A or 200A panels and short runs from panel to garage. Most standard installs are $2,550, permit included, with same-week scheduling.

CSLB C-10 #1134931 · Tesla Certified Installer · Santa Clara County

⚡

Tesla Certified Installer

ChargeWizards is Tesla Certified (CSLB #1134931), which means we source DPM equipment directly from Tesla — including the Neurio energy meter with proprietary firmware that isn't available through retail channels. Not all installers can offer DPM.

EV Charger Services in Campbell

Cost in Campbell: most standard installs $2,550 all-in

Most standard Campbell EV charger installs are $2,550 all-in, including the Campbell permit and final inspection coordination. Most Campbell homes are simple installs — short conduit runs and panels with headroom. DPM rarely needed.

  • • Pre-wired homes: from $850
  • • Standard install: $2,550 all-in, including the permit
  • • Panel upgrade, only if truly needed: $7,500+ (DPM lets most homes skip it)
  • • The final price depends on your setup; we give a firm quote after seeing panel photos

Compare full pricing on our EV charger cost page. Prices do not subtract any rebate or tax credit; the federal 30C EV charger tax credit for homes ended for chargers placed in service after June 30, 2026.

Rebate disclaimer: ChargeWizards can provide documentation such as your invoice, permit, and installation photos to help support a rebate application, but we do not guarantee any rebate, eligibility, or amount. Rebate programs and funding change often and can end without notice, so please confirm eligibility and apply directly with the program administrator. Program information last checked September 26, 2026.

Permits in Campbell

All EV charger installs in Campbell go through the City of Campbell Community Development Department (Santa Clara County). We pull the permit, submit the complete NEC 220.87 load calc, panel schedule, and one-line diagram with every application — first-pass approvals are the norm. Most Campbell applications get reviewed in 5–14 business days.

Reference: City of Campbell Community Development Department (Santa Clara County)

Panel Considerations in Campbell

Campbell homes from the 60s–80s commonly have 125A or 200A service. Many panels still have headroom for a 60A circuit without DPM, which keeps installs straightforward and affordable.

Read more: Do I need a panel upgrade for an EV charger?

Campbell EV Charger FAQs

Serving all of the Bay Area · View all Bay Area service areas

EV charger installed in Campbell — turnkey.

Tesla Certified, fast-moving on Campbell permits (typical 5–10 business day review). Call (650) 542-8877 or request a free photo quote.

📞 (650) 542-8877

Licensed C-10 contractor · No obligation · Bay Area only